![]() |
![]() |
| SAFE RAIL déménage son siège social à Nantes SAFE RAIL moves its head office in the district EuroNantes (south side of Nantes... |
| SAFE RAIL se structure pour faire face à sa croissance Safe Rail vient de procéder à une augmentation de capital de 200 k€. La société, spécialisée dans la signalisation... |
![]() |
|
05-11-2012 05-11-2012 |
SAFE RAIL’s clients all place large orders in the national and international Railway sectors. They are institutions, infrastructure management companies, Railway operators or Railway equipment manufacturers.
The current position of SAFE RAIL in the Railway Signalling market is the fruit of accumulated experience and, since 2003, capitalised upon by our partners on the various projects and missions to which we have been entrusted by our clients.
|
Development of the port railway installations at Montoir de Bretagne Date : 2007-2009 Our expertise : PROJECT & CONTRACT MANAGEMENT Infrastructure type : Harbour Railway Final customer : PORT AUTONOME DE NANTES SAINT-NAZAIRE Place : Montoir de Bretagne Development of a railway circuit for the port industries at Montoir de Bretagne. |
|
Contracting for ETCS level 1 signalling equipments supply and laying Date : 2007-2008 Our expertise : PROJECT & CONTRACT MANAGEMENT Infrastructure type : Main lines Final customer : RESEAU FERRE DE FRANCE Place : Paris Project of ETCS European corridors. |
|
Connection of line 1 and 2 of Nantes tramway Date : 2007-2010 Our expertise : PROJECT & CONTRACT MANAGEMENT Infrastructure type : Tramway Final customer : SEMITAN Place : Nantes Project of connection of lines 1 and 2 of Nantes tramway to allow a meshing of the network in order to facilitate movements between districts without passing by the centre of Nantes. |
|
Detailed design of the Paris subway line 1 (line 1 automation) Date : 2007-2008 Our expertise : BASIC DESIGN - DETAILED DESIGN Infrastructure type : Subway Final customer : RATP Place : Paris The project consists in realizing for subway line 1 automation, the renewal of railway signalling equipments of Château de Vincennes termini, Porte Maillot, La Défense as well as the temporary service of Esplanade station. |
|
Shunting track circuit study of Lyon LEA Tramway Date : 2004-2005 Our expertise : BASIC DESIGN - DETAILED DESIGN Infrastructure type : Tramway Final customer : SYTRAL Place : Lyon The originality of this project lies in the important variations of speed of the tramway according to the environment (urban or peri-urban), going from 35 kph to 70 kph. To respect the requirements of safety and operation, level crossings replace for the first time in France the road marking on the crossings (26 level crossings were installed throughout the 14,7 kilometres of way). |
|
Madrid - Lerida High Speed Line - Compliance analysis of the RBC with European specifications Date : 2006-2008 Our expertise : VERIFICATION AND VALIDATION Infrastructure type : Main lines Final customer : ANSALDO STS Place : Spain ERTMS project of compliance analysis of the Spain RBC specifications, on Madrid - Lerida Line, with checking - control and signalling STI requirements. |
|
SSI-NG (PAI-NG) Validation Date : 2008 Our expertise : VERIFICATION AND VALIDATION Infrastructure type : Main lines Final customer : ANSALDO STS Place : France SNCF and RFF decided to develop a new system of solide-state interlocking (PAI-NG: SSI New Generation) for needs of development and renewal of the existing park. Three industrialists by whom Ansaldo STS were held to develop their own system of interlocking. |
|
Verification of the OURAGAN system detailed design for Paris subway line 3 Date : 2007 Our expertise : VERIFICATION AND VALIDATION Infrastructure type : Subway Final customer : RATP Place : Paris The project consists of the verification of cablings detailed design for the ATO (automatic train operation) fixed equipments of the OURAGAN system (new system of automatic piloting) of the Paris subway line 3. |
|
Cabinet replacement for a barrier intersection - Lyon LEA Tramway Date : 2008 Our expertise : MAINTENANCE - WORKS Infrastructure type : Tramway Final customer : KEOLIS Place : Lyon Safe Rail made the preparation of the realization of the project of the cabinet replacement, the follow-up and the realization of the project, as well as the works and the site test. |
|
Maintenance of railway installations in Cordemais (44 – France) Date : 2008-2010 Our expertise : MAINTENANCE - WORKS Infrastructure type : Industrial and Harbour Railway Final customer : EDF Place : Cordemais Preventative and corrective maintenance of all signalling equipments of Cordemais site with week and weekend call out cover. |
| Safe Rail - Your railway signalling Expert 4 rue Marcel Paul 44000 Nantes France - Tél. + 33 (0)2 51 70 27 24 - 3 rue de l’arrivée 75749 Paris France - www.safe-rail.com |